Show All Clear

Canary Wharf

< >
  • Location: London
  • Type: Refurbishment
  • Client: Canary Wharf Group PLC
  • Contractor: Bovis Lend Lease
  • Year: 2002

Both Canada Tower and the new HSBC Bank HQ at Canary Wharf. have been fitted with Alumasc’s Derbigum and Hydrotech systems. In total, around 8,000 sq. m of the systems have been installed on a variety of deck areas, from ground level to the 44th storey. The systems were recommended because their robustness and ease of installation could meet the challenges of construction in a restricted area.

White House Works, Bold Road, Sutton, St Helens, Merseyside, WA9 4JG