Show All Clear

Anderston Phase 5 Development

< >
  • Location: Glasgow
  • Client: Taylor Wimpey
  • Architect: Aedas Architects
  • Installer: Briggs Amasco
  • Year: 2010

Hydrotech MM6125 structural waterproofing from Alumasc was chosen for Glasgow’s £56million mixed-use development from Taylor Wimpey. Alumasc approved installer Briggs Amasco were active in the specification of Hydrotech MM6125, which they recommended to the architects as a durable, more cost effective alternative to mastic asphalt, and which also offered the benefit of not requiring a screed. 2,500m² of Hydrotech MM6125 was installed over the ballasted protected roof areas. Hydrotech is a durable, self-healing monolithic waterproofing membrane, which was the first hot-melt waterproofing system to be introduced to the UK construction market. Hydrotech’s unique formulation guarantees lifetime performance. It is manufactured using 20% postconsumer recycled material.

White House Works, Bold Road, Sutton, St Helens, Merseyside, WA9 4JG